Tons and Tons More Needed
On 18 December I (with a lot of help from my son) shovelled 750kg (1 cubic metre) of 20mm aggregate into the hollows of the driveway. Then some time in January or February (I didn't record in diary) I shovelled another 750kg load of 20mm aggregate myself into more hollows. Previously the driveway was like a roller coaster. It is better now, but I can see from the puddles after rain that I will probably need at least one or two more loads. I have included the photos taken after rain to better identify the worse hollows.
No comments:
Post a Comment